1 C C20 Demolition 100mm partitions and make good 1 56 56 1 56 m2 DP Demolition 100mm partitions and make good 1 56 56 C-1-C-DP-1 Demolition 100mm partitions and make good 4 14 56 m2 2 D D20 Excavate oversite 1 130 130 1 130 m3 EO Excavate oversite 1 130 130 D-2-D-EO-1 Excavate oversite 2 65 130 m3 3 C C42 Break up concrete floor and h/c under 1 288 288 1 288 m2 BU Break up concrete floor and h/c under 1 288 288 C-3-C-BU-1 Break up concrete floor and h/c under 9 32 288 m2 4 C C90 Remove door and frame and prepare opening for window 900 x 2100 approx (1, 3) 1 100 100 1 100 nr RD Remove door and frame and prepare opening for window 900 x 2100 approx (1, 3) 1 100 100 C-4-C-RD-1 Remove door and frame and prepare opening for window 900 x 2100 approx (1, 3) 2 50 100 nr 5 C C46 Form opening in cavity wall approx 4800 x 2400 including structural support over and mg fins (4) 1 3196 3196 1 3196 item FO Form opening in cavity wall approx 4800 x 2400 including structural support over and mg fins (4) 1 3196 3196 C-5-C-FO-1 Form opening in cavity wall approx 4800 x 2400 including structural support over and mg fins (4) 1 3196 3196 item 6 C C45 Remove manhole and reconnect pipes and seal off redundant pipes (5) 1 150 150 1 150 item RM Remove manhole and reconnect pipes and seal off redundant pipes (5) 1 150 150 C-6-C-RM-1 Remove manhole and reconnect pipes and seal off redundant pipes (5) 1 150 150 item 7 D D20 Excavate to reduce levels 1 75 75 1 75 m3 ET Excavate to reduce levels 1 75 75 D-7-D-ET-1 Excavate to reduce levels 1 75 75 m3 8 D D20 Remove excavated material 1 200 200 1 200 m3 RE Remove excavated material 1 200 200 D-8-D-RE-1 Remove excavated material 4 50 200 m3 9 D D20 Level and compact bottom of excavations 1 9.9 9.9 1 9.9 m2 LA Level and compact bottom of excavations 1 9.9 9.9 D-9-D-LA-1 Level and compact bottom of excavations 9 1.1 9.9 m2 10 D D20 Apply weedkiller to bottom of excavations 1 9.9 9.9 1 9.9 m2 AW Apply weedkiller to bottom of excavations 1 9.9 9.9 D-10-D-AW-1 Apply weedkiller to bottom of excavations 9 1.1 9.9 m2 11 D D20 Hardcore bed 125mm thick 1 135 135 1 135 m2 HB Hardcore bed 125mm thick 1 135 135 D-11-D-HB-1 Hardcore bed 125mm thick 9 15 135 m2 12 D D20 Hardcore making up levels 1 0 0 0 0 m3 HM Hardcore making up levels 1 0 0 D-12-D-HM-1 Hardcore making up levels 0 80 0 m3 13 D D20 50mm Sand blinding 1 45 45 0 0 m2 SB 50mm Sand blinding 1 45 45 D-13-D-SB-1 50mm Sand blinding 9 5 45 m2 14 D D20 Concrete bed 100-200mm thick laid on blinded hardcore 1 380 380 1 380 m3 CB Concrete bed 100-200mm thick laid on blinded hardcore 1 380 380 D-14-D-CB-1 Concrete bed 100-200mm thick laid on blinded hardcore 2 190 380 m3 15 D D20 A142 Mesh reinforcement in slab 1 63 63 0 0 m2 AM A142 Mesh reinforcement in slab 1 63 63 D-15-D-AM-1 A142 Mesh reinforcement in slab 9 7 63 m2 16 D D20 Polythene dpm 1 22 22 0 0 m2 PD Polythene dpm 1 22 22 D-16-D-PD-1 Polythene dpm 11 2 22 m2 17 G G20 50 x 50 Noggins 1 42.45 42.45 1 42.45 m XN 50 x 50 Noggins 1 42.45 42.45 G-17-G-XN-1 50 x 50 Noggins 15 2.83 42.45 m 18 G G20 Sundry first fix carpentry 1 0 0 1 0 item SF Sundry first fix carpentry 1 0 0 G-18-G-SF-1 Sundry first fix carpentry 0 250 0 item 1 K Monolift Glass Free Standing Flush Glass Cladding system FGW Type 01 RAL9005 (blac 1 18371.11 18371.11 1 18371.11 item GP Glass panel and support frame 6 1056.5 6339 K-1-MG-GP-1 0 0 0 nr K-1-MG-GP-2 Glass Panel 898x4375x11.5 toughened laminated printed white 5 110 550 nr K-1-MG-GP-3 VHB tape 9 2.5 22.5 nr K-1-MG-GP-4 Silicon mastic 9 5 45 nr K-1-MG-GP-5 Backing frame 1 250 250 nr K-1-MG-GP-6 Top support brkt 1 90 90 nr K-1-MG-GP-7 Bottom support brkt doubles as protestion bar 1 90 90 nr K-1-MG-GP-8 Wall fixings 18 0.5 9 nr K-1-MG-GP-9 Hours - Assemble panel in factory 1 0 0 hr K-1-MG-GP-10 Hours - Install battens on site 1 man 2 hr 2 0 0 hr K-1-MG-GP-11 Hours - Install battens on site 2 man 2 hr 4 0 0 hr K-1-MG-GP-12 Hours - Hang panel 4men 1hr 4 0 0 hr SS Stainless Skirting 8 60.97 487.76 K-1-MG-SS-1 Skirting backing section 1 17.85 17.85 nr K-1-MG-SS-2 Stainless front section 1 39.02 39.02 nr K-1-MG-SS-3 Fixings 6 0.35 2.1 nr K-1-MG-SS-4 Hours 2 0 0 hr K-1-MG-SS-5 Adhesive 1 2 2 nr SF Sub Frame 4.3 34.5 148.35 K-1-MG-SF-1 ZED Section per meter 3 10 30 nr K-1-MG-SF-2 Fixings 3 per length x 3 lengths 9 0.5 4.5 nr K-1-MG-SF-3 Hours 2 0 0 hr EC End cappings Stainless 12 133.5 1602 K-1-MG-EC-1 Stainless end cap 20x150x20 4 times bent per meter 1 125 125 nr K-1-MG-EC-2 Mdf core 1 4 4 nr K-1-MG-EC-3 Adhesive 1 3 3 nr K-1-MG-EC-4 Fixings 3 0.5 1.5 nr K-1-MG-EC-5 Hours 1 0 0 hr SH Stainless 2/3 height horizontal trim 4 255 1020 K-1-MG-SH-1 Stainless trim 1 250 250 nr K-1-MG-SH-2 Fixings 1 5 5 nr K-1-MG-SH-3 Hours 2 0 0 hr BP Black powder coated soffit trim 4 255 1020 K-1-MG-BP-1 Painted soffit section 1 250 250 nr K-1-MG-BP-2 Fixings 1 5 5 nr K-1-MG-BP-3 Hours 4 0 0 hr SS Structural steel frame 4 1296 5184 K-1-MG-SS-1 Frame 1 1000 1000 nr K-1-MG-SS-2 Floor anchors 8 25 200 nr K-1-MG-SS-3 Hours 16 0 0 hr K-1-MG-SS-4 Dry packing/packers 32 3 96 nr ST Stainless trims around doors and drinking fountains 4 80 320 K-1-MG-ST-1 Stainless trims 1 75 75 nr K-1-MG-ST-2 Fixings 1 5 5 nr K-1-MG-ST-3 Hours 4 0 0 hr SF Sub floor support costs from line 408 3 750 2250 K-1-MG-SF-1 Materials 1 750 750 nr K-1-MG-SF-2 Hours 4 0 0 hr 2 K glass screen Glass screen - 2390m high High Frosted glass screen 1 61572 61572 22 2798.73 lm GP Glass panels 25.5mm with white print and SGP interlayer toughened and heat soaked including Dorma do 1 18720 18720 K-2-GS-GP-1 1200x2390 18 990 17820 nr K-2-GS-GP-2 Hours - Install glass 4 men 1 panel 4 hour x 18 72 0 0 hr K-2-GS-GP-3 Print to glass /m2 9 100 900 nr K-2-GS-GP-4 Hours 12 0 0 hr FT Floor track 3kn aluminium extrusion 10 600 6000 K-2-GS-FT-1 MOD:6908 aliminium track 2.5m long 1 458 458 nr K-2-GS-FT-2 MOD:6907 locking wedges and trims per 2.5m 1 42 42 nr K-2-GS-FT-3 M12 anchors at 200mm ctrs 10 10 100 nr K-2-GS-FT-4 Hours - Install track 2men 4hrs/m 12 0 0 hr SP Support posts for glass door PPC mild steel 100x50x6 22 407 8954 K-2-GS-SP-1 Posts 1 357 357 nr K-2-GS-SP-2 Anchors 4 10 40 nr K-2-GS-SP-3 Hours 4 0 0 hr K-2-GS-SP-4 Packers 1 10 10 nr CS Circular Stainless clamping plates at panel joints x3 54 77 4158 K-2-GS-CS-1 Stainless circular tapped boss 1 35 35 nr K-2-GS-CS-2 Fixings 1 15 15 nr K-2-GS-CS-3 Hours 0.5 0 0 hr K-2-GS-CS-4 stainless boss 1 25 25 nr K-2-GS-CS-5 Fixing 1 2 2 nr K-2-GS-CS-6 Hours 0.5 0 0 hr SS Structural silicon to joint 20 72 1440 K-2-GS-SS-1 Structural silicon black 4 18 72 nr SI Stainless interface panels between door and glass screen 6 385 2310 K-2-GS-SI-1 Stainless panels 2 150 300 nr K-2-GS-SI-2 Infill core 1 75 75 nr K-2-GS-SI-3 Fixings 1 10 10 nr K-2-GS-SI-4 Hours 4 0 0 hr FH Full height stainless door handles 4 625 2500 K-2-GS-FH-1 Door handles 2 300 600 nr K-2-GS-FH-2 Fittings 1 25 25 nr K-2-GS-FH-3 Hours 4 0 0 hr SF Sub floor support structure/m 22 795 17490 K-2-GS-SF-1 200x100 PFC 2 113 226 nr K-2-GS-SF-2 100x100 at 600mm ctrs 2 111 222 nr K-2-GS-SF-3 Resin anchors 2 at 600mm ctrs 4 27 108 nr K-2-GS-SF-4 Fabrication 2 nr welds 2 40 80 nr K-2-GS-SF-5 Primed finish 3 5 15 nr K-2-GS-SF-6 Hours - Install 2men 1hr/m 2 0 0 hr K-2-GS-SF-7 Fabrication 3 40 120 nr K-2-GS-SF-8 Dry packing/packers 8 3 24 nr 3 L glass doors 2390 High Frosted glass doors 4 6462 25848 4 6462 nr GP Glass panels 25.5mm with white print and SGP interlayer toughened and heat soaked inclusing Dorma do 1 2990 2990 L-3-GD-GP-1 Glass Panel 1200x2390 1 990 990 nr L-3-GD-GP-2 Install glass 4 men 1 panel 4 hour x 1 8 0 0 hr L-3-GD-GP-3 Dorma floor pivot and head pivot 2 175 350 nr L-3-GD-GP-4 Sliding catch custom fabrication 1 500 500 nr L-3-GD-GP-5 Install hinge and catch 16 0 0 hr L-3-GD-GP-6 Print to glass /m2 1 100 100 nr L-3-GD-GP-7 Dorma top and bottom rails 2 300 600 nr L-3-GD-GP-8 Hours 12 0 0 hr L-3-GD-GP-9 Stainless trims 5 75 375 nr L-3-GD-GP-10 Silicon 5 15 75 nr L-3-GD-GP-11 Hours 5 0 0 hr SP Support posts for glass door PPC mild steel 100x50x6 3 407 1221 L-3-GD-SP-1 Posts 1 357 357 nr L-3-GD-SP-2 Anchors 4 10 40 nr L-3-GD-SP-3 Hours 4 0 0 hr L-3-GD-SP-4 Packers 1 10 10 nr SS Structural silicon to jointd 2 72 144 L-3-GD-SS-1 Structural silicon black 4 18 72 nr SI Stainless interface panels between door and glass screen 0 385 0 L-3-GD-SI-1 Stainless panels 2 150 300 nr L-3-GD-SI-2 Infill core 1 75 75 nr L-3-GD-SI-3 Fixings 1 10 10 nr L-3-GD-SI-4 Hours 4 0 0 hr FH Full height stainless door handles 1 625 625 L-3-GD-FH-1 Door handles 2 300 600 nr L-3-GD-FH-2 Fittings 1 25 25 nr L-3-GD-FH-3 Hours 4 0 0 hr SF Sub floor support structure/m 2 741 1482 L-3-GD-SF-1 200x100 PFC 2 113 226 nr L-3-GD-SF-2 100x100 at 600mm ctrs 2 111 222 nr L-3-GD-SF-3 Resin anchors 2 at 600mm ctrs 2 27 54 nr L-3-GD-SF-4 Fabrication 2 nr welds 2 40 80 nr L-3-GD-SF-5 Primed finish 3 5 15 nr L-3-GD-SF-6 Hours - Install 2men 1hr/m 2 0 0 hr L-3-GD-SF-7 Fabrication 3 40 120 nr L-3-GD-SF-8 Dry packing/packers 8 3 24 nr 4 K glazed scree Glazed screen Type 05 - Full height glazed screen to stair and escalator void - to both sides at L10 1 87761.36 87761.36 39 2250.29 lm ST Stainless trim and Bottom track @ 1.0m lengths 39 559.78 21831.26 K-4-GS-ST-1 Top 4 55 220 nr K-4-GS-ST-2 M6 Countersunk bolt set 12 1 12 nr K-4-GS-ST-3 Glass shims 12 1.5 18 nr K-4-GS-ST-4 hours - Install glazing clamp 8 0 0 hr K-4-GS-ST-5 Stainless cover Trim Top and Bottom 4 35 140 nr K-4-GS-ST-6 Fixing screws 6 0.4 2.4 nr K-4-GS-ST-7 hours - Install support 4 0 0 hr K-4-GS-ST-8 HSC-I anchors 6 9 54 nr K-4-GS-ST-9 Arbocol resin 2.4 47.24 113.38 nr GP Glass Panel 6 nr. 30 1697.67 50930.1 K-4-GS-GP-1 1300 x 4200mm x 25.5mm Laminated toughened Glass Panel 1.5m ctrs 5.46 250 1365 nr K-4-GS-GP-2 Silicon structural grade 11 25 275 nr K-4-GS-GP-3 Manifestations 1 57.67 57.67 nr K-4-GS-GP-4 hours - Install Panel 3 0 0 hr SF Sub floor frame costs from line 408 20 750 15000 K-4-GS-SF-1 Materials 1 750 750 nr K-4-GS-SF-2 Hours 4 0 0 hr 5 K glazed scree 1100 High glass screen adjacent to existing gates 1 5832 5832 4 1458 nr GP Glass panels 25.5mm with white print and SGP interlayer toughened and heat soaked inclusing Dorma do 4 540 2160 K-5-GS-GP-1 1500x600 1 350 350 nr K-5-GS-GP-2 Hours - Install glass 4 men 1 panel 4 hour x 4 0 0 hr K-5-GS-GP-3 Print to glass /m2 1 100 100 nr K-5-GS-GP-4 Dorma top and bottom rails 0 0 0 K-5-GS-GP-5 Hours 2 0 0 hr K-5-GS-GP-6 Stainless trim 1 75 75 nr K-5-GS-GP-7 silicon 1 15 15 nr FT Floor track 3kn aluminium extrusion 1 600 600 K-5-GS-FT-1 MOD:6908 aliminium track 2.5m long 1 458 458 nr K-5-GS-FT-2 MOD:6907 locking wedges and trims per 2.5m 1 42 42 nr K-5-GS-FT-3 M12 anchors at 200mm ctrs 10 10 100 nr K-5-GS-FT-4 Hours - Install track 2men 4hrs/m 12 0 0 hr SP Support posts for glass panels PPC mild steel 100x50x6 0 407 0 K-5-GS-SP-1 Posts 1 357 357 nr K-5-GS-SP-2 Anchors 4 10 40 nr K-5-GS-SP-3 Hours 4 0 0 hr K-5-GS-SP-4 Packers 1 10 10 nr CS Circular Stainless clamping plates at panel joints x3 0 40 0 K-5-GS-CS-1 Stainless circular tapped boss 1 25 25 nr K-5-GS-CS-2 Fixings 1 15 15 nr K-5-GS-CS-3 Hours 0.5 0 0 hr SS Structural silicon to jointd 4 27 108 K-5-GS-SS-1 Structural silicon black 1.5 18 27 nr SI Stainless interface panels between door and glass screen 0 385 0 K-5-GS-SI-1 Stainless panels 2 150 300 nr K-5-GS-SI-2 Infill core 1 75 75 nr K-5-GS-SI-3 Fixings 1 10 10 nr K-5-GS-SI-4 Hours 4 0 0 hr FH Full height stainless door handles 0 625 0 K-5-GS-FH-1 Door handles 2 300 600 nr K-5-GS-FH-2 Fittings 1 25 25 nr K-5-GS-FH-3 Hours 4 0 0 hr SF Sub floor support structure/m was 4 4 741 2964 K-5-GS-SF-1 200x100 PFC 2 113 226 nr K-5-GS-SF-2 100x100 at 600mm ctrs 2 111 222 nr K-5-GS-SF-3 Resin anchors 2 at 600mm ctrs 2 27 54 nr K-5-GS-SF-4 Fabrication 2 nr welds 2 40 80 nr K-5-GS-SF-5 Primed finish 3 5 15 nr K-5-GS-SF-6 Hours - Install 2men 1hr/m 2 0 0 hr K-5-GS-SF-7 Fabrication 3 40 120 nr K-5-GS-SF-8 Dry packing/packers 8 3 24 nr 6 L Gate 1 nr glass gate 1200 wide / 2 nos post 1 3714.68 3714.68 1 3714.68 nr GG Glass Gate 1 3714.68 3714.68 L-6-G-GG-1 Glass Gate 1 3714.68 3714.68 nr L-6-G-GG-2 Install - 1st fix 30 0 0 hr L-6-G-GG-3 Install - 2nd fix 30 0 0 hr 7 L Balustrade Balustrade Type 01 - T2 Standard - Glass Balustrades 1100 High to stairs 1 40870.5 40870.5 39 1047.96 lm P Posts 47 47 209.5 9846.5 L-7-B-P-1 Post 1 200 200 nr L-7-B-P-2 M12 Hex set screws x 65 8 1 8 nr L-7-B-P-3 Shims 1 1.5 1.5 nr L-7-B-P-4 Hours 4 0 0 hr HR Hand Rail 45 45 91 4095 L-7-B-HR-1 0diax5 wall Stainless tube 304 240 grit DP 1 90 90 nr L-7-B-HR-2 Fixings 2 0.5 1 nr L-7-B-HR-3 Hours 2 0 0 hr HR Hand rail brackets and glass clamp 47 47 86 4042 L-7-B-HR-1 Handrail bracket 1 20 20 nr L-7-B-HR-2 Handrail support bracket 1 20 20 nr L-7-B-HR-3 Fixings 2 0.5 1 nr L-7-B-HR-4 Nylon / Rubber washers 2 2 4 nr L-7-B-HR-5 Back glass clamp 1 15 15 nr L-7-B-HR-6 Front glass clamp 1 15 15 nr L-7-B-HR-7 Rubber washers 2 5 10 nr L-7-B-HR-8 Fixings 2 0.5 1 nr L-7-B-HR-9 Hours 1 0 0 hr GP Glass Panel Raking and rectangular 45 45 149 6705 L-7-B-GP-1 Glass 1200x800 x13.8 1 110 110 nr L-7-B-GP-2 Glass base gasket 1.8m 19.5042.011.00 Q-r 2 15 30 nr L-7-B-GP-3 Hours 2 0 0 hr L-7-B-GP-4 Silicon to base 0.5 18 9 nr AS Aluminium/stainless Stair Track 48 48 306 14688 L-7-B-AS-1 Top aluminium track or stainless grill 300x1000 including pressed ss edge trims 1 275 275 nr L-7-B-AS-2 Fixings 8 1 8 nr L-7-B-AS-3 Hours 2 0 0 hr L-7-B-AS-4 Devweld 1 5 5 nr L-7-B-AS-5 Polishing 1 18 18 nr L-7-B-AS-6 Hours 2 0 0 hr B Bends 4 298.5 1194 L-7-B-B-1 Bending 1 245 245 nr L-7-B-B-2 Stainless tube 0.5 35 17.5 nr L-7-B-B-3 Welding and polishing 1 36 36 nr L-7-B-B-4 Hours 4 0 0 hr E Ends 4 75 300 L-7-B-E-1 End 1 75 75 nr 8 A Preliminaries Preliminaries - HAL in hours 1 136162.5 136162.5 1 136162.5 item D Design 1 44594 44594 A-8-P-D-1 Design Detailing / week 900 42.66 38394 dhr A-8-P-D-2 Engineering Calculations / project item 1 5000 5000 nr A-8-P-D-3 O and M Manual Preparation / week 37.5 32 1200 dhr TT Testing /Samples (desk top only) 1 1500 1500 A-8-P-TT-1 Testing 1 1000 1000 nr A-8-P-TT-2 Samples 1 500 500 nr PM Project /Site management 1 62938.5 62938.5 A-8-P-PM-1 Project Manager / week 450 69.33 31198.5 mhr A-8-P-PM-2 Quantity Surveyor / week 112.5 85.33 9599.63 mhr A-8-P-PM-3 Project Assistant / week 150 34.13 5119.5 mhr A-8-P-PM-4 Health and Safety Manager (visiting 1 day evry 2 weeks) 37.5 85.33 3199.88 mhr A-8-P-PM-5 Site Foreman x 1 / week 450 29.86 13437 mhr A-8-P-PM-6 Attendant Labourer / hour 12 32 384 mhr TU Transport / Unloading 1 6840 6840 A-8-P-TU-1 Vehicle 24 285 6840 nrp A-8-P-TU-2 Out of hours 96 0 0 hro PT Plant / Temporary Access 1 12900 12900 A-8-P-PT-1 Towers x 4 4 120 480 nrp A-8-P-PT-2 Scissor lifts x 2 12 360 4320 nrp A-8-P-PT-3 Genies x 2 10 150 1500 nrp A-8-P-PT-4 Big panel lifter and glass 12 550 6600 nrp RR Rubbish Removal to Skips by others 16 0 0 A-8-P-RR-1 Hours 1 0 0 hr SA Site accomodation 0 25 0 A-8-P-SA-1 Telephone line / internet 1 25 25 nr FC Final Clean 1 0 0 A-8-P-FC-1 Hours 40 0 0 hr PD Protection during Transportation 1 1000 1000 A-8-P-PD-1 Protection 1 1000 1000 nr OF Office / Furniture 0 0 0 A-8-P-OF-1 Computer 0 0 0 A-8-P-OF-2 Printer fax 0 0 0 TS Temporary Services 8 330 2640 A-8-P-TS-1 Services 2 40 80 nrp A-8-P-TS-2 Parking 1 250 250 nr M Mobilisation 0 0 0 A-8-P-M-1 Mobilisation 0 0 0 nr SA Safety / Accident Provisions PTs training 1 2000 2000 A-8-P-SA-1 PPE 8 100 800 nrp A-8-P-SA-2 Maintain PPE 8 50 400 nrp A-8-P-SA-3 Induction training 8 100 800 nr SS Surveys / Setting out 1 1750 1750 A-8-P-SS-1 Equipment 1 250 250 nrp A-8-P-SS-2 Survey 1 1500 1500 nr AW Adverse Weather Provisions 0 0 0 A-8-P-AW-1 0 0 0 0 nr TL Task Lighting 1 0 0 EO Extra over for night time working 0 0 0 A-8-P-EO-1 75% of total man hours 4000 0 0 hre A adjustment 0 0 0 A-8-P-A-1 adjustment 0.5 0 0 nr 9 K Wall Protection Metal Wall Protection, Rimex Metals, Stainless Steel, Pattern: Treadtex - P20/150G 1 7004.48 7004.48 76.67 91.36 m2 TP Treadtex Panel 1225x 2500 cut to 1100mm wide strips for wall protection 01 28 250.16 7004.48 K-9-WP-TP-1 1.25x2.5m panel ciut down to 1100 1 190 190 nr K-9-WP-TP-2 Factory trim Trim to 1100 width 1 45 45 nr K-9-WP-TP-3 gripfill adhesive 1 3.16 3.16 nr K-9-WP-TP-4 face fixing screws anti tamper at 500ctrs 12 1 12 nr K-9-WP-TP-5 install panel 2.5m long 2 0 0 hr 10 L Riser Grillage Internal Grillage; Floor Type 4.1 Flooring: 50mm deep mild steel galvanised 1 8231 8231 23.41 351.6 m2 FG 02 - Floor Grill 50mm deep fixed to 150x90 PFC hot dip galv finish 100x150 angle cleats to wall M16 2.5 3292.4 8231 L-10-RG-FG-1 50mm glav floor grill/m2 10.4 175 1820 nr L-10-RG-FG-2 install PFC 2men 1hr/m 12 0 0 hr L-10-RG-FG-3 install grill 2men 1hr/m2 20 0 0 hr L-10-RG-FG-4 Cleats to clamp grill to PFC 4/m2 40 1.75 70 nr L-10-RG-FG-5 M16 anchors 2/angle bracket 48 10 480 nr L-10-RG-FG-6 Angle brackets 150x100 2/m 24 25 600 nr L-10-RG-FG-7 150x90 pfc hot dip galv/m 6.2 52 322.4 nr 11 L Ladder BS-5395-3 Ladder BS-5395-3. Manufacturer: Alton industries (GB) Ltd - L35/130 1 900 900 7 128.57 nr CL CAT Ladder 1 900 900 L-11-LB-CL-1 ladder /m 5 140 700 nr L-11-LB-CL-2 anchors m16 expanding 10 20 200 nr L-11-LB-CL-3 install 2 men 8 hrs 16 0 0 hr 12 L L35/150A Ladder L35/150A Ships ladder type 7nr treads with hand rail 1 1950 1950 1 1950 nr SL Ships Ladder 1 1950 1950 L-12-L-SL-1 ladder /tread 7 250 1750 nr L-12-L-SL-2 anchors m16 expanding 10 20 200 nr L-12-L-SL-3 install 2 men 8 hrs 16 0 0 hr 13 L L30/105 Balustrades L30/105 Allowed as mild steel ppc finish vertical bars at 100mm ctrs 1 14792 14792 38.75 381.73 lm SB Stair balustrade/lm 40 369.8 14792 L-13-L-SB-1 Stair balustrade 1 350 350 nr L-13-L-SB-2 fixings/lm 2nr / baluster 18 1.1 19.8 nr L-13-L-SB-3 drill and fix anchor 10min each 180min 3 0 0 hr L-13-L-SB-4 erect panel 2 0 0 hr 14 L L30 / 580 Handrails L30 / 580 1 4522.5 4522.5 54.76 82.59 lm WM Wall mounted handrail 1 4522.5 4522.5 L-14-L-WM-1 wall mounted hand rail/lm 60 75 4500 nr L-14-L-WM-2 M12 wall anchor 3nr/lm 3 7.5 22.5 nr L-14-L-WM-3 drill and fix / anchor 10mins/anchor 30 0.5 0 0 hr L-14-L-WM-4 install hand rail 2 0 0 hr 15 L Bike Stands Bike Stands - Manufacturer: Bikedock Solutions or equal ; Product reference: Two Tier Bike Rack - Wi 1 190 190 30 6.33 nr TT two tier bike rack 1 190 190 L-15-BS-TT-1 bike rack 1 150 150 nr L-15-BS-TT-2 anchors 8 5 40 nr L-15-BS-TT-3 install 2men 4hrs 4 0 0 hr 16 L Bike Racks Racks Manufacturer: Bikedock Solutions or equal ; Product reference: Wall Dock. Code: BDS0278; Mater 1 118 118 34 3.47 nr WM Wall mounted bike rack with locking hoops 1 118 118 L-16-BR-WM-1 rack and locking hoop 1 88 88 nr L-16-BR-WM-2 anchors 6 5 30 nr L-16-BR-WM-3 install 4 0 0 hr 17 U Metal Louvre blade Metal Louvre blade pitch and angle to be determinded in developing the design to allow 50% free area 1 13081 13081 103 127 m2 LP Louvre panels 1m2 103 117 12051 U-17-MLB-LP-1 louver /m2 1.9x1.69 1 116 116 nr U-17-MLB-LP-2 assembly of louvre kit 4 0 0 hr U-17-MLB-LP-3 tech screws 20 0.05 1 nr IO Installation of louvre 103 10 1030 U-17-MLB-IO-1 2 men 2hr/m 4 0 0 hr U-17-MLB-IO-2 M12 anchors 2 5 10 nr 18 A Preliminaries Preliminaries - Back of house 1 89100 89100 1 89100 item D Design 1 22500 22500 A-18-P-D-1 Design Detailing / week 12 1200 14400 wks A-18-P-D-2 Design Development/ week 0.5 5000 2500 wks A-18-P-D-3 Engineering Calculations / project item 1 4100 4100 nr A-18-P-D-4 O and M Manual Preparation / week 2 750 1500 wks A-18-P-D-5 Design Checking and IT / week 0 1000 0 wks A-18-P-D-6 IR Administration 1day/week 0 950 0 wks A-18-P-D-7 REVIT Licence and Yellow jacket licence 0 5500 0 nr TS Testing / Samples and Mock up of 3.6m widex4m high including steels and glass and balustrade 1 6000 6000 Sr No. Activity Quantity Rate Total Unit A-18-P-TS-1 Testing of anchors 10% 1 4000 4000 nr A-18-P-TS-2 Samples Desk top only 4 500 2000 nr PM Project management and Site 1 43650 43650 Sr No. Activity Quantity Rate Total Unit A-18-P-PM-1 Project Director 0 3500 0 wks A-18-P-PM-2 Project Manager / week 8 2150 17200 wks A-18-P-PM-3 Quantity Surveyor / week 3 1900 5700 wks A-18-P-PM-4 Project Assistant / week 5 950 4750 wks A-18-P-PM-5 Health and Safety Manager (visiting 1 day every 2 weeks) 2 2000 4000 wks A-18-P-PM-6 Site Foreman x 1 / week 0 1120 0 wks A-18-P-PM-7 Attendant Labourer / hour 1hr/wks 0 0 0 hra A-18-P-PM-8 Night Manager 0 1750 0 wks A-18-P-PM-9 Lifting Supervisor 8 1500 12000 wks A-18-P-PM-10 IR Administration 0 950 0 wks A-18-P-PM-11 Temporary works supervisor training 0 750 0 nr TU Transport / Unloading 20 185 3700 Sr No. Activity Quantity Rate Total Unit A-18-P-TU-1 Vehicle 1 185 185 nr A-18-P-TU-2 Out of Hours 1 0 0 hra A-18-P-TU-3 Congestion charge 0 11.5 0 nr A-18-P-TU-4 Low emmission charge 0 12.5 0 nr PT Plant / Temporary Access 16 475 7600 Sr No. Activity Quantity Rate Total Unit A-18-P-PT-1 Towers x4 2 75 150 nrp A-18-P-PT-2 Scissor lifts x 4 0 175 0 nrp A-18-P-PT-3 Crane/telehandler 0 1200 0 nrp A-18-P-PT-4 Genies x 2 2 75 150 nrp A-18-P-PT-5 Crane delivery and training 0 1000 0 nrp A-18-P-PT-6 Floor crane 0 150 0 nrp A-18-P-PT-7 Glass lifter 0 750 0 nrp A-18-P-PT-8 Glass hand suckers 4nr 0 100 0 nrp A-18-P-PT-9 Trolley/pallet 1 25 25 nrp A-18-P-PT-10 Wheeled stillage 2 75 150 nrp A-18-P-PT-11 Specialist temporary works 0 450 0 nrp RR Rubbish Removal to Skips by others 20 0 0 A-18-P-RR-1 Out of Hours 1 0 0 hra SA Site accomodation 0 25 0 A-18-P-SA-1 Telephone line / internet 1 25 25 nr FC Final Clean 1 0 0 A-18-P-FC-1 Hours 20 0 0 hr PD Protection during Transportation 1 500 500 A-18-P-PD-1 Protection 1 500 500 nr OF Office / Furniture 0 0 0 A-18-P-OF-1 Computer 0 1000 0 nr A-18-P-OF-2 Printer fax 0 500 0 nr TS Temporary Services 20 100 2000 A-18-P-TS-1 Parking 1 100 100 nr M Mobilisation 0 0 0 A-18-P-M-1 Mobilisation 0 1000 0 nr SA Safety / Accident Provisions PTs training 1 2900 2900 A-18-P-SA-1 PPE 0 100 0 nr A-18-P-SA-2 Maintain PPE 5 50 250 nr A-18-P-SA-3 Personal safety training / person 5 530 2650 nr SS Surveys / Setting out 1 250 250 A-18-P-SS-1 Equipment 1 250 250 nr A-18-P-SS-2 Survey 40 0 0 hr AW Adverse Weather Provisions 0 0 0 TL Task Lighting 1 0 0 19 L Key clamp Key Clamp Metail Handrail 1 250 250 1 250 unit KK Kee klamp barriers 4 post 3 rail 1 250 250 L-19-KC-KK-1 Post 1095 5 6 30 nr L-19-KC-KK-2 Rail 10 6 60 nr L-19-KC-KK-3 90degree elbow 10 3 30 nr L-19-KC-KK-4 Short T joint 10 5 50 nr L-19-KC-KK-5 Base 2 fixing 5 6 30 nr L-19-KC-KK-6 M12 expanding anchors 10 5 50 nr L-19-KC-KK-7 Install bases 2men1hr x4 10 0 0 hr L-19-KC-KK-8 Install posts 2men1/2hr x 4 5 0 0 hr L-19-KC-KK-9 Install rails 2men 1/2hrx10 10 0 0 hr 20 K Skirting 50mm high bronze finish recessed skirting fixed to substrate by others 1000 40.4 40400 1029 39.26 lm BF Bronze finish skirting with FSB MDF backing board/lm 1 40.4 40.4 K-20-S-BF-1 Bronze stainless 1.5mm 240 grit grade 316 80mm girth 1x bent 20mm return material 1 12 12 nr K-20-S-BF-2 MDF 15mm x50 packed and shimmed off substrate 1 5 5 nr K-20-S-BF-3 Shims 5 0.08 0.4 nr K-20-S-BF-4 fixing screws 4 0 0 nr K-20-S-BF-5 adhesive gripfill 1 0.5 0.5 nr K-20-S-BF-6 install mdf 1 0 0 hr K-20-S-BF-7 install stainless 0.5 0 0 hr K-20-S-BF-8 fabrication 0.5 45 22.5 nr 21 K Curved skirting Curved 50mm high bronze finish recessed skirting fixed to substrate by others 1 140.4 140.4 3 46.8 lm BF Bronze finish skirting with FSB MDF backing board/lm 1 140.4 140.4 K-21-CS-BF-1 Bronze stainless 1.5mm 240 grit grade 316 80mm girth 1x bent 20mm return material 1 12 12 nr K-21-CS-BF-2 MDF 15mm x50 packed and shimmed off substrate 1 15 15 nr K-21-CS-BF-3 Shims 5 0.08 0.4 nr K-21-CS-BF-4 fixing screws 4 0 0 nr K-21-CS-BF-5 adhesive gripfill 1 0.5 0.5 nr K-21-CS-BF-6 install mdf 1 0 0 hr K-21-CS-BF-7 install stainless 0.5 0 0 hr K-21-CS-BF-8 fabrication 0.5 45 22.5 nr K-21-CS-BF-9 curving 2 45 90 nr 22 A Preliminaries Preliminaries - in weeks 1 19966 19966 1 19966 D Design 1 4800 4800 A-22-P-D-1 Design Detailing / week 160 30 4800 dhr A-22-P-D-2 Design Development/ week 0 5000 0 wks A-22-P-D-3 Engineering Calculations / project item 0 4000 0 wks A-22-P-D-4 O and M Manual Preparation / week 0 750 0 wks A-22-P-D-5 Design Checking and IT / week 0 1000 0 wks TS Testing / Samples 1 500 500 A-22-P-TS-1 Testing 0 1000 0 nr A-22-P-TS-2 Samples Desk top only 1 500 500 nr PM Project management and Site 1 11082 11082 A-22-P-PM-1 Project Director 0 0 0 wks A-22-P-PM-2 Project Manager / week 2 2150 4300 wks A-22-P-PM-3 Quantity Surveyor / week 0.4 1900 760 wks A-22-P-PM-4 Project Assistant / week 1 950 950 wks A-22-P-PM-5 Health and Safety Manager (visiting 1 day every 2 weeks) 0.2 2000 400 wks A-22-P-PM-6 Site Foreman x 1 / week 4 1120 4480 wks A-22-P-PM-7 Attendant Labourer / hour 6 32 192 TU Transport / Unloading 6 209 1254 A-22-P-TU-1 Vehicle 1 185 185 nr A-22-P-TU-2 Out of Hours 4 0 0 hr A-22-P-TU-3 Congestion charge 1 11.5 11.5 nr A-22-P-TU-4 Low emmission charge 1 12.5 12.5 nr PT Plant / Temporary Access 0 3230 0 A-22-P-PT-1 Towers x 4 1 120 120 nrp A-22-P-PT-2 Scissor lifts x 2 1 360 360 nrp A-22-P-PT-3 Crane/telehandler 1 1200 1200 nrp A-22-P-PT-4 Genies x 2 1 150 150 nrp A-22-P-PT-5 Crane delivery and training 1 1000 1000 nrp A-22-P-PT-6 Floor crane 1 150 150 nrp A-22-P-PT-7 Glass lifter 1 250 250 nrp RR Rubbish Removal to Skips by others 6 0 0 A-22-P-RR-1 Hours 4 0 0 hr SA Site accomodation 0 25 0 A-22-P-SA-1 Telephone line / internet 1 25 25 nr FC Final Clean 1 0 0 A-22-P-FC-1 removal of waste low tack film 12 0 0 hr A-22-P-FC-2 Hours 12 0 0 hr PD Protection during Transportation 1 500 500 A-22-P-PD-1 Protection 1 500 500 nr OF Office / Furniture 0 0 0 A-22-P-OF-1 Computer 0 1000 0 nr A-22-P-OF-2 Printer fax 0 500 0 nr TS Temporary Services 12 40 480 A-22-P-TS-1 Services 1 40 40 nr M Mobilisation 0 0 0 A-22-P-M-1 Mobilisation 0 1000 0 nr SA Safety / Accident Provisions PTs training 1 400 400 A-22-P-SA-1 PPE 4 100 400 nr A-22-P-SA-2 Maintain PPE 0 50 0 nr A-22-P-SA-3 Personal track safety training / person 0 530 0 nr SS Surveys / Setting out 1 950 950 A-22-P-SS-1 Equipment 1 250 250 nr A-22-P-SS-2 Survey 20 35 700 nr AW Adverse Weather Provisions 0 0 0 TL Task Lighting 1 0 0 23 K K13/146 L30-560A - White Painted Balustrade - Unglazed - T5 Standard - 1100 High 1800mm ctrs with twin rail 1 7388 7388 23 321.22 lm P Posts 14 209.5 2933 K-23-K-P-1 Post 1 200 200 nr K-23-K-P-2 M12 Hex set screws x 65 8 1 8 nr K-23-K-P-3 Shims 1 1.5 1.5 nr K-23-K-P-4 Hours 4 0 0 hra HR Hand Rail 2 levels 26 106 2756 K-23-K-HR-1 50diax5 wall Stainless tube 304 240 grit DP 1 105 105 nr K-23-K-HR-2 Fixings 2 0.5 1 nr K-23-K-HR-3 Hours 2 0 0 hra HR Hand rail brackets and glass clamp 14 116 1624 K-23-K-HR-1 Handrail bracket 1 35 35 nr K-23-K-HR-2 Handrail support bracket 1 35 35 nr K-23-K-HR-3 Fixings 2 0.5 1 nr K-23-K-HR-4 Nylon / Rubber washers 2 2 4 nr K-23-K-HR-5 Back glass clamp 1 15 15 nr K-23-K-HR-6 Front glass clamp 1 15 15 nr K-23-K-HR-7 Rubber washers 2 5 10 nr K-23-K-HR-8 Fixings 2 0.5 1 nr K-23-K-HR-9 Hours 1 0 0 hra GP Glass Panel Raking and rectangular 0 234 0 K-23-K-GP-1 Glass 1100x870 x13.8 1 210 210 nr K-23-K-GP-2 Glass base gasket 1.8m 19.5042.011.00 Q-r 1 15 15 nr K-23-K-GP-3 Hours 2 0 0 hra K-23-K-GP-4 Silicon to base 0.5 18 9 nr AF Aluminium/stainless Floor Track 0 306 0 K-23-K-AF-1 Top aluminium track or stainless grill 300x1000 including pressed ss edge trims 1 275 275 nr K-23-K-AF-2 Fixings 8 1 8 nr K-23-K-AF-3 Hours 2 0 0 hra K-23-K-AF-4 Devweld 1 5 5 nr K-23-K-AF-5 Polishing 1 18 18 nr K-23-K-AF-6 Hours 2 0 0 hra B Bends 0 298.5 0 K-23-K-B-1 Bending 1 245 245 nr K-23-K-B-2 Stainless tube 0.5 35 17.5 nr K-23-K-B-3 Welding and polishing 1 36 36 nr K-23-K-B-4 Hours 4 0 0 hra E Ends 1 75 75 K-23-K-E-1 End 1 75 75 nr 24 K K13/146 L30-560A - White Painted Balustrade - Ungazed - T5 Standard - 1100 High 1800mm ctrs with twin rails 1 9000.5 9000.5 29 310.36 lm P Posts 17 209.5 3561.5 K-24-K-P-1 Post 1 200 200 nr K-24-K-P-2 M12 Hex set screws x 65 8 1 8 nr K-24-K-P-3 Shims 1 1.5 1.5 nr K-24-K-P-4 Hours 4 0 0 hra HR Hand Rail 2 levels 32 106 3392 K-24-K-HR-1 50diax5 wall Stainless tube 304 240 grit DP 1 105 105 nr K-24-K-HR-2 Fixings 2 0.5 1 nr K-24-K-HR-3 Hours 2 0 0 hra HR Hand rail brackets and glass clamp 17 116 1972 K-24-K-HR-1 Handrail bracket 1 35 35 nr K-24-K-HR-2 Handrail support bracket 1 35 35 nr K-24-K-HR-3 Fixings 2 0.5 1 nr K-24-K-HR-4 Nylon / Rubber washers 2 2 4 nr K-24-K-HR-5 Back glass clamp 1 15 15 nr K-24-K-HR-6 Front glass clamp 1 15 15 nr K-24-K-HR-7 Rubber washers 2 5 10 nr K-24-K-HR-8 Fixings 2 0.5 1 nr K-24-K-HR-9 Hours 1 0 0 hra GP Glass Panel Raking and rectangular 0 234 0 K-24-K-GP-1 Glass 1100x870 x13.8 1 210 210 nr K-24-K-GP-2 Glass base gasket 1.8m 19.5042.011.00 Q-r 1 15 15 nr K-24-K-GP-3 Hours 2 0 0 hra K-24-K-GP-4 Silicon to base 0.5 18 9 nr AF Aluminium/stainless Floor Track 0 306 0 K-24-K-AF-1 Top aluminium track or stainless grill 300x1000 including pressed ss 1 275 275 nr K-24-K-AF-2 Fixings 8 1 8 nr K-24-K-AF-3 Hours 2 0 0 hra K-24-K-AF-4 Devweld 1 5 5 nr K-24-K-AF-5 Polishing 1 18 18 nr K-24-K-AF-6 Hours 2 0 0 hra B Bends 0 298.5 0 K-24-K-B-1 Bending 1 245 245 nr K-24-K-B-2 Stainless tube 0.5 35 17.5 nr K-24-K-B-3 Welding and polishing 1 36 36 nr K-24-K-B-4 Hours 4 0 0 hra E Ends 1 75 75 K-24-K-E-1 End 1 75 75 nr 25 K K13/146 Glass wall and lining not exceeding 600mm - K13/146 and L40.230A 8mm with 6mm 1.5mm coloured interla 1 6300 6300 25 252 m GP Glass panel and hangers/panel per m2 15 290 4350 K-25-K-GP-1 Glass panel m2 8mm 6mm 1.5mm interlayer 1 200 200 nr K-25-K-GP-2 Edge polish lm 4 2.5 10 nr K-25-K-GP-3 Structural silicon/lm 2 20 40 nr K-25-K-GP-4 Hanging brackets/lm extruded aluminium 2 20 40 nr K-25-K-GP-5 Install panel 2men 60mins/1m2 =1x1 2 0 0 nr K-25-K-GP-6 Hours 2 0 0 hra SF Support frame/m2 15 130 1950 K-25-K-SF-1 Frame per 1m2 including fixings and packers 1 130 130 nr K-25-K-SF-2 Hours - Install 60mins/m2 2men 2 0 0 hra SS Stainless skirting 0 122 0 K-25-K-SS-1 Outer stainless panel 1 65 65 nr K-25-K-SS-2 Inner zintec panel 1 45 45 nr K-25-K-SS-3 Fixings 1 2 2 nr K-25-K-SS-4 VHB tape 2 5 10 nr K-25-K-SS-5 Hours 1 0 0 hra PM PPC metal panels 0 240 0 K-25-K-PM-1 Powder coated mild steel sheet from 4x2m sheet 50% waste 1 75 75 nr K-25-K-PM-2 Fabrication 2 45 90 nr K-25-K-PM-3 Fixings 1 5 5 nr K-25-K-PM-4 Hours 1 0 0 hra K-25-K-PM-5 Hanging brackets 1 20 20 nr K-25-K-PM-6 Plasterboard and bonding 1 50 50 nr SF Support frame 0 130 0 K-25-K-SF-1 Frame per 1m2 including fixings and packers 1 130 130 nr K-25-K-SF-2 Hours - Install 60mins/m2 2men 2 0 0 hra PP Perforated PPC panels 0 407 0 K-25-K-PP-1 Powder coated mild steel sheet from 4x2m sheet 50% waste 1 75 75 nr K-25-K-PP-2 Fabrication 2 45 90 nr K-25-K-PP-3 Perforation 1 200 200 nr K-25-K-PP-4 Fixings 1 10 10 nr K-25-K-PP-5 Hours 1 0 0 hra K-25-K-PP-6 Tissue/pad 1 12 12 nr K-25-K-PP-7 Hanging brackets 1 20 20 nr SF Support frame 0 130 0 K-25-K-SF-1 Frame per 1m2 including fixings and packers 1 130 130 nr K-25-K-SF-2 Hours - Install 60mins/m2 2men 2 0 0 hra TL Top level PPC panels 0 130 0 K-25-K-TL-1 Powder coated mild steel sheet from 2.5x1.25m sheet 1 35 35 nr K-25-K-TL-2 Fabrication 2 45 90 nr K-25-K-TL-3 Fixings 1 5 5 nr K-25-K-TL-4 Hours 1 0 0 hra SF Support frame 0 130 0 K-25-K-SF-1 Frame per 1m2 including fixings and packers 1 130 130 nr K-25-K-SF-2 Hours - Install 60mins/m2 2men 2 0 0 hra SC Stainless corner trims 0 155 0 K-25-K-SC-1 Stainless trim/m 1 150 150 nr K-25-K-SC-2 Fixings 1 5 5 nr K-25-K-SC-3 Hours 2 0 0 hra 26 K K13/146 Glass wall and lining exceeding 600mm- K13/146 and L40.230A 8mm with 6mm 1.5mm coloured interlayer 1 8400 8400 20 420 m2 GP Glass panel and hangers/panel per m2 20 290 5800 K-26-K-GP-1 Glass panel m2 8mm 6mm 1.5mm interlayer 1 200 200 nr K-26-K-GP-2 Edge polish lm 4 2.5 10 nr K-26-K-GP-3 Structural silicon/lm 2 20 40 nr K-26-K-GP-4 Hanging brackets/lm extruded aluminium 2 20 40 nr K-26-K-GP-5 Install panel 2men 60mins/1m2 =1x1 2 0 0 K-26-K-GP-6 Hours 2 0 0 hra SF Support frame/m2 20 130 2600 K-26-K-SF-1 Frame per 1m2 including fixings and packers 1 130 130 nr K-26-K-SF-2 Hours - Install 60mins/m2 2men 2 0 0 hra SS Stainless skirting 0 122 0 K-26-K-SS-1 Outer stainless panel 1 65 65 nr K-26-K-SS-2 Inner zintec panel 1 45 45 nr K-26-K-SS-3 Fixings 1 2 2 nr K-26-K-SS-4 VHB tape 2 5 10 nr K-26-K-SS-5 Hours 1 0 0 hra PM PPC metal panels 0 407 0 K-26-K-PM-1 Powder coated mild steel sheet from 4x2m sheet 50% waste 1 75 75 nr K-26-K-PM-2 Fabrication 2 45 90 nr K-26-K-PM-3 Perforation 1 200 200 nr K-26-K-PM-4 Fixings 1 10 10 nr K-26-K-PM-5 Hours 1 0 0 hra K-26-K-PM-6 Tissue/pad 1 12 12 nr K-26-K-PM-7 Hanging brackets 1 20 20 nr SF Support frame 0 130 0 K-26-K-SF-1 Frame per 1m2 including fixings and packers 1 130 130 nr K-26-K-SF-2 Hours - Install 60mins/m2 2men 2 0 0 hra PP Perforated PPC panels 0 407 0 K-26-K-PP-1 Powder coated mild steel sheet from 4x2m sheet 50% waste 1 75 75 nr K-26-K-PP-2 Fabrication 2 45 90 nr K-26-K-PP-3 Perforation 1 200 200 nr K-26-K-PP-4 Fixings 1 10 10 nr K-26-K-PP-5 Hours 1 0 0 hra K-26-K-PP-6 Tissue/pad 1 12 12 nr K-26-K-PP-7 Hanging brackets 1 20 20 nr SF Support frame 0 250 0 K-26-K-SF-1 Stainless trim/m 1 130 130 nr K-26-K-SF-2 Fixings 2 60 120 nr